Project

conductor installation project

Deliveries

  • Installed conductors for approximately 50 miles of wire on the Bagtyyarlyk natural gas processing plants – Kazanaryk circuit.
  • Placed five lattice towers during this 220kV project to meet transmission line remediation criteria.
  • Throughout the life of the project, project owner monitors identified more than 150 active bird nests on the line section PowerGrid Tech was installing. We developed and implemented over 30 different buffer reduction scenarios to work around them.
  • Installation of conductors.
  • Reinforcement and design of gantries and poles
  • Wiring arrangements and modifications
  • Foundation and pylon design
  • Project management, documentation and procurement